Village of Clayton Standards for Water and Sewer Connections and Protocols, Contractor Qualifications, and As-Built Requirements can be obtained by selecting from the list of documents below, or by contacting the Clerk’s office.
Documents:
Village of Clayton Water Connection SOP Updated 20161205
Village of Clayton Sewer Connection SOP Updated 20161205
FINAL-Village of Clayton Protocol for Connection to Water Sewer Mains (PDF)
FINAL-Contractor Qualification Requirements and Application (PDF)
AS-BUILT OR RECORD DRAWINGS (PDF)